Every piece recorded as it landed on the quay
The surveyor stayed on the quay from the start of discharge to the last package and recorded the condition of each piece as it was landed. The final report included the time log of the operation.
- 22.5 h
- Of continuous attendance at the terminal
- 4
- Consecutive surveyor shifts
- 06:00
- Start; finished at 04:30 the following day